- Main Contractor
- Smulders Group
- Location
- E314 Heusden-Zolder
- Country
- Belgium
Zolder Bridge, Belgium
Supplied in 2016, the Zolder bridge with a span of 124m and a total weight of 1250 tons.
The design required bespoke non standard sizes, we supplied M80, M90, M110 and M120 tendons with turnbuckles in galvanised finish.
Supplied with full 3.2 cerification.
Image credit Smulders